June 18, 2025

It ‘s hard to believe the progress of building our home in Ely MN. Terry and his brother Steve have worked from breakfast to supper every day for three weeks.
A couple days ago they anticipated our four-inch deluge and flew through every job trying to seal the frame up to protect all their work. Even I was out with Terry in the dark bailing water out of the boat that had been left at the wrong angle. More rain is predicted for several days.


You all are amazing! I am in such awe. I hope the rain isn’t as bad as predicted…
LikeLike